Hi,
Thanks very much for the link - that's very useful.
Hmm. So essentially, as I understand it:
0) There's no way to "import" an entire running cluster into a new vCenter server?
1) I have enough capacity to take one host out at any time;
2) I could build a new cluster based on one host with the same basic config (iSCSI, management, vMotion, FT nets and main internet links)
3) Then hot migrate 1/3 of my VMs to it.
4) Make a new compliance profile from the new host
5) Remove 2nd host from old cluster and move to new cluster and apply profile.
6) Migrate another 1/3 of VMs over
7) Repeat 5-6 until done.
Hmm - that does seem like a lot of work and a lot of scope for stuff to go wrong. I really need to read up on this rather a lot more...
Tim