Hi I wonder if so done could give me advice in the following
i have a cluster has 3 Hosts running Enterprise Plus on 4.1 with DVS.
I want to migrate(fresh install maybe) the same hosts to 5.5 with Standard Switches while keeping the VM’s running and not changing mac addresses or anything like that.
A new standalone 5.5 VC appliance has been setup.
Would I need to migrate the hosts onto Standard switches then add them to the new vc then rebuild them one by one into 5.5? Could 4.1 and 5.5 coexist for a very short (2 days) time?
many thanks in advance
Daz