OK great! I have 5 Datacenters, in different geographical locations managed by 1 vCenter 5.0 instance. 3 of the DC's have 2 hosts, and the other 2 have 4 hosts (clustered within each datacenter).
I am looking to transfer all hosts to the new 5.5 vCenter instance.
Question, what configurations have to be redone in the new vCenter, and what will just move over with the hosts?
I mean do I have to go in and pre-set-up networks on the new vCenter, or will it just see them when I transfer in a host that has them from the old system?
What else do I need to do to test the new 5.5 set up before starting to migrate hosts over?
Thanks in advance,